ERP for manufacturing

The manufacturing platform links the order, the bill of materials, the machine and the delivery, so the plant knows its real cost per part and its next bottleneck.

Book a call
Demo companyPlant twin · Tuesday 24 November · 10:05Demo dataPlant twinOrdersSchedulingQualityMaintenanceCostsOEE today71%target 75%Machines running9 / 12Orders late2Scrap1.8%MachiningAssemblyInspection and shippingCNC 1OEE 82%WO 4471 · 340/500CNC 2OEE 77%WO 4468 · 88/120CNC 3Stopped 42 minBroken toolLathe 1OEE 74%WO 4473Lathe 2Setup25 min leftGrinderMaintenanceuntil 13:00SawOEE 64%DeburringOEE 69%Station A142 units / hStation A2Waiting for parts3D inspection12 queuedShipping4 parcelsRunningSetupStoppedMaintenanceCurrent stopsCNC 342 minBroken tool · Ø 8 cutterWO 4469 one day lateMove to CNC 2Station A225 minWaiting for CNC 3 partsGrinderplannedPreventive maintenanceDemo companyCustomer ordersDemo dataPlant twinOrdersSchedulingQualityMaintenanceCostsOpen orders46Order bookCHF 1,284,000On time, 3 months91%Late2N°ClientPartQuantityDeliveryProgressStatus4469Medical SATitanium housing20024.11.55%1 d late4471Jura watchmakerMainplate50027.11.68%On time4468RobotecMachined flange12025.11.73%Tight4473Rey pumpsShaft Ø 228002.12.21%On time4466Medical SAFixing screw5,00020.11.92%4 d late4475Aéro ComposantsEngine bracket609.12.0%Material or…4470RobotecMachined flange1204.12.10%On timeOrder 4466Medical SA5,000 screws · 4 days lateGood parts4,600In inspection400Forecast finishThursday 26, 11:00Partial delivery possible todayOffer 4,600 parts todayDemo companyScheduling · Tuesday 24 NovemberDemo dataPlant twinOrdersSchedulingQualityMaintenanceCostsWork orders14Machine hours planned96 hSetup time7.5 h−2 h by groupingLoad88%6:007:008:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00CNC 15-axisWO 4471 · mainplatesSetupWO 4475CNC 23-axisWO 4468 · flangesSetupWO 4469 movedWO 4470CNC 33-axisWO 4469Stop · toolWO 4466 · screwsLathe 1WO 4473 · shaftsWO 4473 · shaftsLathe 2WO 4472SetupWO 4474FreeGrinderWO 4466MaintenanceWO 4466Demo companyQuality · 12 weeksDemo dataPlant twinOrdersSchedulingQualityMaintenanceCostsScrap rate1.8%target 1.5%Customer complaints3Cost of poor qualityCHF 14,200this quarterParts inspected18,420Scrap per week, % of parts1.4%W371.2%W381.6%W391.3%W401.5%W411.4%W422.6%W432.9%W441.9%W451.6%W461.7%W471.8%W48Target 1.5%Weeks 43 and 44Cause found by crossing the dataMachineCNC 3Material batchTi-2219DefectØ 4.2 out of toleranceParts scrapped412Claim filed with the supplierSee the 8D reportDemo companyMaintenanceDemo dataPlant twinOrdersSchedulingQualityMaintenanceCostsMachine availability94%Breakdowns this month3Preventive jobs due5Mean time to repair1.9 hMachineJobHours sinceDue atWearStatusCNC 1Spindle lubrication48650097%This weekGrinderAnnual overhaul2,0102,000100%RunningCNC 3Filter change41050082%PlannedLathe 2Geometry check1,7202,00086%PlannedCNC 2Y-axis belt3,1004,00078%OKCompressorOil change1,9402,00097%This weekVibration signalCNC 1spindle · up 18% in 10 daysSame curve as the March breakdownMarch breakdown costCHF 18,600Overhaul costCHF 3,900Schedule on SaturdayDemo companyCost per partDemo dataPlant twinOrdersSchedulingQualityMaintenanceCostsMargin on actual cost23%Parts under calculated pri…4Machine hour costCHF 118Material prices, 3 months+6%Actual cost against quoted cost, CHF per partTitanium housingCHF 86.40Machined flangeCHF 41.20Engine bracketCHF 64.80MainplateCHF 18.60Shaft Ø 22CHF 12.90Fixing screwCHF 2.40QuotedActualTitanium housingGap of CHF 14.40 per partCycle time+6 minTitanium price+11%Scrap4.1%Next order: revise the price or the pro…Recalculate the quote
Plant twinDemo dataOEE today71%Machines running9 / 12Orders late2Scrap1.8%StopsCNC 3Broken tool · stopped 42 minStation A2Waiting for partsRunningCNC 1OEE 82% · WO 4471 · 340/500CNC 2OEE 77% · WO 4468

The plant twin

Every machine on the floor plan with its status, its load for the next two weeks and its OEE, plus the orders at risk of missing their date.

What it changes

The five modules that move the most money, and the data each needs to start.

01

Parts sold below cost found and repriced

Real cost per part, with quote self-correction

Data to start: BOM, routings, hours, material

02

Late deliveries, penalties

Delivery date promise from real capacity

Data to start: Orders, routings, stock

03

Scrap and recalls reduced

Defect root cause and lot genealogy

Data to start: Quality, production, lots

04

Quote time, quote accuracy

Similar part finder for quotes

Data to start: Drawings, cost history

05

Lost machine time made visible

Hidden factory and OEE

Data to start: Shop-floor data

Every module

Core

Sales and orders

Quote configuratorVariants, quantities, delivery dates, price from cost.
Delivery date promise*A date computed from capacity and material, not guessed.
Order intake by AICustomer orders and drawings read into orders.
Customer portalOrder status, documents, reorders.

Planning

Capacity planning*Load per machine and per team for the coming weeks.
Production schedulingSequence per machine, changeover times reduced.
Material requirementsWhat to buy and when, from orders and stock.
Bottleneck finderThe machine or step that limits output.

Shop floor

Shop-floor terminalStart, stop, quantities, scrap per order.
Machine statusRunning, stopped, setup, with stop reasons.
OEE per machine*Availability, performance, quality.
Work instructions on screenDrawings, steps, photos.
Tool and mould registerLife, cycles, maintenance.

Quality

Inspection plans and resultsPer part and batch.
Non-conformities and corrective actions.
TraceabilityLot from raw material to customer.
CertificatesMaterial and conformity certificates attached to deliveries.
Defect pattern finder*Defects linked to machine, shift, material lot or supplier.

Maintenance

Preventive maintenanceIntervals by hours or cycles.
Breakdown logCause, downtime, cost.
Spare parts stockCritical parts, reorder points.
Failure forecastMachines likely to fail, from breakdown history and hours.

Purchasing and stock

Supplier orders and confirmations.
Supplier performanceDelays, quality, price.
Raw material price watchEffect of price moves on product cost.
Stock value and turnover.

Cost and finance

Real cost per part*Material, machine time, labour, scrap, against the quoted cost.
Margin per product and per customer.
Make or buyCost of in-house against subcontracting.
Energy cost per order.
Cash forecast.

People

Shift planning by skill.
Skills matrixWho can run which machine.
Time and payroll link.

Compliance

Safety and machine checks.
Export and customs documents.
Unconventional*
Similar part finder*A new drawing matched to past parts with known cost and routing.
Quote self-correction*The gap between quoted and actual cost feeds the next quote automatically.
Energy peak shaving*Energy-heavy jobs scheduled outside peak tariff hours.
Operator know-how by voice*Operators record tips by voice, turned into work instructions.
Scrap photo classifier*A photo of a rejected part proposes the defect type.
Single-source risk radar*Parts with one supplier, and that supplier's public warning signs.
Spare capacity for sale*Idle machine hours offered to other companies.
Customer forecast portal*Customers share their forecasts, which feed material planning.
Changeover sequencing*Jobs ordered to minimise setups between colours, materials or tools.
CO₂ per part*Carbon per part for customers who must report it.
AI Layer
Company modelCustomer, order, part, drawing, BOM, routing, machine, shift, lot, supplier, defect, linked.
Quote agent*Reads the drawing, finds similar past parts and proposes price and delivery date from real capacity.
Planning agent*Re-sequences the schedule when a machine stops or a rush order lands, and shows which orders move.
Quality agent*Links defects to machine, shift, lot and supplier, and proposes the corrective action.
Supply agent*Watches lead times and single-source parts and proposes safety stock or a second supplier.
Maintenance agent*Forecasts breakdowns from hours and history and books the service in a quiet slot.
Simulation*A new machine, a third shift or a price rise in steel, and the effect on cost per part and delivery dates.
Ask the company“Which parts do we sell below real cost?”
Data Fusion
Lot genealogy*Every finished part traced back to raw material lots, machines, operators and settings, and forward to customers.
Defect root cause*Scrap traced across machine, shift, operator, material lot, supplier, temperature and tool wear.
Hidden factory*Time lost to micro-stops, waiting for material, rework and changeovers, summed per machine.
Supplier tier map*The suppliers behind your suppliers, from public registers and certificates, to see shared single points of failure.
Customer forecast reliability*Each customer's forecasts compared with what they really ordered.
Maintenance log text mining*Recurring causes from free-text breakdown notes.
Breakdown early signal*Cycle time drift and rising scrap that came before past breakdowns.
Peer benchmark*Opt-in and anonymised, OEE, scrap rate and on-time delivery against similar plants.

Questions

Is an ERP a multi-year project?

Not for a small company that starts with the essentials. Scope is set per project, step by step.

Let’s talk about your company

A fifteen-minute call to see whether an analysis makes sense for you. Or by phone, on +41 26 420 00 86.

Book a call