Software for architecture and engineering firms

The design-office platform runs projects by phase, fees against hours, plans and the paper trail with clients, authorities and contractors.

Book a call
Demo companyPhase board · NovemberDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeActive projects16Fees in progressCHF 2,380,000Phases over hours3Fees billable nowCHF 86,400ProjectSIA phaseHours / budgetProgressFeesStatusLes Cèdres building12 flats · Pully53 · Construction710 / 1,000 h64%CHF 612,000OKCorsy schoolRenovation · Lutry41 · Tender448 / 400 h80%CHF 286,000OverSauthier houseDetached · Épalinges32 · Design154 / 280 h60%CHF 96,000OKSports centreCompetition · Pully22 · Competition288 / 300 h85%–Due 8.12Verger condos8 units · Morges33 · Permit216 / 200 h90%CHF 184,000ObjectionMorel conversionAttic · Vevey53 · Handover94 / 100 h97%CHF 58,000To billCorsy schoolPhase 41: 48 hours over22 work packages tendered312 hBid comparisons96 hTown’s questions40 hThe questions fall outside the signed m…Prepare an extra fee requestDemo companyAcquisitionDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeCompetitions and bids63-year win rate24%Hours invested612 hNext deadline8 DecProjectClientTypeDueHoursStatusSports centreTown of PullyCompetition8.12.288 / 300 hModel to buildCare home extensionMorel foundationStudy mandate19.12.48 / 120 hRunning16-flat buildingLake cooperativeFee bid15.1.8 / 40 hRunningStation renovationCFFTender30.1.4 / 80 hGo / no goLogistics hallTransports GerberFee bid10.11.24 / 24 hWonBelmont schoolTown of BelmontCompetition2.10.320 / 320 h3rd placeGo / no goStation renovationtender, due 30.1References required2 stationsOur referen…0 stations, 3 schoolsHours estimated80 hSuggestion: pass, or team up with an of…Decide at Monday’s meetingDemo companyDrawings · Les Cèdres buildingDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeActive drawings184Revisions this month37Waiting for the engineer4Sent to site22DrawingTitleRevisionChangedIssued toStatusA-2032nd floor planF20.11.Site, MEPIssuedA-310Stair sectionC19.11.Structural engineerWaiting for engin…A-410South façadeD18.11.Façade contractorIssuedA-501Window detailB17.11.JoinerComments receivedS-120Slab 3 rebarA15.11.ArchitectTo checkA-215Roof planE14.11.SiteIssuedAutomatic checkA-310 · Cstair sectionClash with drawing S-120Opening 12 cm narrowerSinceengineer’s revision A, 15.11Flag to the engineerDemo companySite · Les Cèdres buildingDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeProgress64%Forecast final costCHF 7,820,000budget CHF 7.7mOpen defects23Next site meetingThursday 8:00Defects reported2Crack in slab 2photo 21.11 · engineerDuct misplacedelectrician · 3rd floorBeing fixed2Entrance door sillmason · due 28.11Balcony 4 waterproofingroofer · due 2.12Decisions needed2Bathroom tiles3 samples · clientCHF 18,000Blind colourbefore 5.12Resolved2Slab 3 levelchecked 18.11✓Window deliveryreceived 20.11✓Demo companyHours and fees · to dateDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeHours logged this month1,286 hBillable rate83%Fees to billCHF 86,400Average hourly rateCHF 138Hours spent against hours quoted, per projectLes Cèdres building710 / 1,000 hCorsy school448 / 400 hSports centre288 / 300 hSauthier house154 / 280 hVerger condos216 / 200 hMorel conversion94 / 100 hQuoteSpentTo bill this monthLes Cèdres · stage…CHF 48,000Morel · balanceCHF 17,400Sauthier · phase 32CHF 21,000TotalCHF 86,400Prepare the invoicesDemo companyOffice · load over 8 weeksDemo dataPhase boardAcquisitionDrawingsConstruction phaseHours and feesOfficeStaff14Average load91%Busiest weekW49 · 118%Holidays booked22 dW48W49W50W51W52W53W54W55C. MorandArchitectPully competitiondue 8.12Les CèdresB. RothArchitectPully competitionMorel care homeCooperativeL. PittetDraughtspersonCorsy · tendersHolidayLes Cèdres · detailsJ. MonnetSite architectLes Cèdres, MorelA. BühlerEngineerVerger · permitFreeInternCompetition modelSauthier survey
Phase boardDemo dataActive projects16Fees in progressCHF 2,380,000Phases over hours3Fees billable nowCHF 86,400Over hoursCorsy schoolPhase 41 · 448 / 400 hVerger condosPhase 33 · objectionWithin hoursLes Cèdres buildingPhase 53 · 710 / 1,000 h

The phase board

Every project with its current phase, hours used against fee, open approvals and permit deadlines, so the partners see which projects lose money before it is too late.

What it changes

The five modules that move the most money, and the data each needs to start.

01

Fee erosion caught, extra fees requested

Fee agent (hours against fee per phase)

Data to start: Time, contracts

02

New projects found before competitors

Feasibility agent and opportunity radar

Data to start: Cantonal geodata, permits

03

Coordination errors and rework

Plan agent (changes summarised and sent)

Data to start: Plan register

04

Proposals priced at real effort

Fee proposal from past projects

Data to start: Time history

05

Disputes over who decided what

Client decision log

Data to start: Minutes, plan versions

Every module

Core

Acquisition

Competition and tender trackerDeadlines, documents, decisions.
Fee proposal from past projects*Hours per phase for similar projects, priced.
Reference sheetsPast projects by type, size, client.
Pipeline.

Project phases

Project plan by phaseFrom feasibility to handover.
Fee against hours per phase*Budget burn per phase and per person, live.
Milestones and client approvals.
Change requests and extra feesCaptured and signed.

Plans and documents

Plan registerVersions, status, recipients, transmittals.
Clash and change summary by AI*What changed between two plan versions, in plain words.
Specifications and bills of quantities.
Building permit fileDocuments, objections, deadlines.
Correspondence logEmails filed by project.

Construction phase

Tender and awardContractor bids compared.
Site meetings and minutesDecisions and actions tracked.
Defect lists with photos.
Cost control against budgetAwarded, invoiced, forecast.
Contractor invoice checking.

Handover

As-built documentation.
Warranty deadlines.
Maintenance plan for the owner.

Office management

Time tracking by project and phase.
Capacity planningStaff per project for the coming months.
Invoicing by phase or hours.
Reminders and cash forecast.
Margin per project and per client*.
Software licences and seatsCAD and BIM licences per person.

Knowledge

Details libraryReusable construction details and specifications.
Lessons learned per project.
Norms and regulations registerWhich version applies to which project.

Compliance

Professional liability file.
nLPD for client data.
Unconventional*
Instant zoning check*Building rights, height and distance rules for a plot, read from public geodata before the first sketch.
Permit time forecast per commune*Typical duration from past permits in that commune.
Objection risk*Plots and project types that drew objections nearby before.
Client decision log*Every client decision with date and plan version, to settle later disputes.
Fee erosion alert*Phases where hours already exceed the fee share, flagged early.
Product feedback from built projects*Materials and products that failed in past buildings, flagged in new specifications.
Site photo against plan*Site photos compared with the plan to spot deviations.
Regulation change alert per project*A new norm or rule matched to the projects it affects.
Competition debrief library*Why past competitions were won or lost, searchable.
Early energy estimate*A first energy figure from volume and envelope, before detailed design.
AI Layer
Company modelClient, project, phase, plot, permit, plan version, specification, contractor, defect, hour, fee, linked.
Feasibility agent*Reads zoning and geodata for a plot and drafts the building rights and a first volume.
Plan agent*Compares plan versions, summarises the changes and tells each recipient what affects them.
Fee agent*Watches hours against fee per phase and drafts the extra-fee request when the client changes scope.
Permit agent*Tracks permit steps, objections and deadlines across all projects.
Simulation*A project delay, a phase added or a team change, and the effect on fees, capacity and cash.
Ask the company“Which projects have used more than 80% of their fee before the phase is done?”
Data Fusion
Opportunity radar*Plots with unused building rights and recent permits nearby, joined into a list of projects waiting to happen.
Fee overrun root cause*Projects that lost money compared with those that did not, by client type, phase, number of plan versions and approvers.
Contractor network*Contractors linked by owners and addresses from public registers, and their record on your past sites.
Change cascade map*How one plan change spread to other plans, specifications and contractors.
Correspondence mining*Decisions and promises buried in emails, extracted and linked to plan versions.
Permit outcome pattern*Objections and refusals in each commune linked to project type, height and use.
Defect feedback graph*Defects on built projects traced back to details, products and specification clauses.
Peer benchmark*Opt-in and anonymised, hours per phase and fee recovery against similar offices.

Questions

Do you touch our CAD software?

No. The CAD software stays; we connect time, documents and invoicing around it.

Let’s talk about your company

A fifteen-minute call to see whether an analysis makes sense for you. Or by phone, on +41 26 420 00 86.

Book a call